Rapid Deployment Pedestrian Scheme 2024 - Northwest LEA

Works Extent

Construction work has been completed on the Rapid Deployment Pedestrian Scheme Northwest.

Objectives

This project aims to provide:

  • Improved facilities for pedestrians to provide more attractive infrastructure to help promote active travel;
  • Enhanced accessibility for pedestrians to local services, places of work and bus stops by delivering dished paths with tactile paving and new paths on desire lines creating more direct routes;
  • Reduction in road widths to be traversed by pedestrians and provision of safer pedestrian uncontrolled crossings;
  • New public lighting designed to enhance inter-visibility between drivers and pedestrians at crossing points, and along new paths.

The Fairfield
The Fairfield; new public lighting and ducting installed around perimeter of the park

John F Connolly Road before works
John F Connolly Road before works commenced; large concrete bollards on the footpaths on both sides of the road. On the left-hand side, an embankment has partially collapsed with heras fencing pushing out into the footpath as a result

John F Connolly Road following completion of section of works.
John F Connolly Road following completion of a section of the works; large concrete bollards are removed, new retaining wall in place on the left-hand side and new footpath in place

Timeline

The scheme was completed in December 2025.

For further information please contact Brendan O’Leary, A/Senior Executive Engineer at email brendan_oleary@corkcity.ie