Road Closure List - 29th Mar 2019

Ongoing Road Closures and Diversions

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

Sawmill Street: Road Closure in place westbound only, until October 2019, from its junction with Rutland Street and Junction with White Street, to facilitate Rutland Square Social Housing Development ( O`Shea Builders)

Sundays Well / Wellington Bridge Junction: Localised Stop/Go in operation to facilitate junction upgrade works (Sorensen Civil Eng.)

Carbery Grove, Knocknaheeny: Road closure in place form 0930hrs on Monday the 2nd of July until Tuesday 30th of April 2019 on Carbery Grove (Between its Junction with Harbour View Road and Junction with Ardmore Avenue at the rear of Bernardos Brighter Future Centre) as part of the City Northwest Quarter Regeneration Scheme Phase 2A. (Murnane & O`Shea)

·         Access for residents on Carbery Grove will be via a new temporary road entering/existing on Ardmore Avenue for this period.

·         A new temporary entrance/exist will be provided from Dunmanus Park for residents of 98-110A Harbour View Road.

Merchants Quay: Lane restriction in place to facilitate preparatory works for Harley Street Bridge Installation (L&M Keating)

St Patricks Quay: Lane restriction in place to facilitate preparatory works for Harley Street Bridge Installation, expect delays (L&M Keating)

Centre Park Road: Localised Give/Take and localised Stop/Go in operation 0800-1800hrs to facilitate footpath renewal works (MGOS)

Millerd Street: Road Closure in place from Friday 22nd of March 2019 until March 2020 from its junction with Francis Street to its junction with Henry Street to facilitate apartment block redevelopment (Vision Contracting)

Daily Road Closures and Diversions

Saturday 30th of March 2019

South City Link / Eglinton Street: Lane restriction in operation 0500-1300hrs to facilitate window cleaning to the Elysian Building (Cagney Cleaning)

Popes Quay: Stop/Go in operation 0430-0700hrs to facilitate crane lift onto St Mary’s Priory Catholic Church (Cumnor Construction)

Sunday 31st of March 2019

South City Link /Albert Street: Lane restriction in operation 0500-1300hrs to facilitate window cleaning to the Elysian Building (Cagney Cleaning)

Lower Glanmire Road: Stop/Go in operation 0600-1300hrs to facilitate repair to water street railway bridge (WC O’Brien)

Monday 01st of April 2019

****Barrack Street****: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 03rd of May 2019 from its junction with Noonan Road to its junction with Reeds Square to facilitate ducting works, Local access to be maintained (MGOS)

St. Patrick`s Quay: Lane restriction in place from 0930hrs on Monday 28th of January for approximately a six week period to facilitate paving works for Harley Street Pedestrian bridge. Harley Street will also be closed as part of the works for the same period (L&M Keating)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out:

·         Mon-Wed: 0930-1430hrs & 1930-0600hrs

·         Thur-Friday: 2200-0600hrs

South Mall: Lane restriction in operation 2030-0600hrs to facilitate crane lifts onto No.1 South Mall. (DFL Construction)

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

***Summerhill North/ MacCurtain Street Junction***: Two Way Stop/Go in operation 2000-0600hrs to facilitate laying of the watermain across the junction (Coffey Northumbrian)

Pine Street: Road closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Devonshire Street to its junction with Camden Place to facilitate water main installation works (Coffey Northumbrian)

Father Mathew Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Friars Walk to its junction with O Connell Avenue (Coffey Northumbrian)

Upper Friars Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Mount Pleasant Road to facilitate water main works (Coffey Northumbrian)

Hawthorn Villas, South Douglas Road: Stop/Go in operation 1930-0600hrs to facilitate water connection works (Coffey Northumbrian)

Lower Glanmire Road: Lane restriction in operation by Supermacs to facilitate footpath snagging works (Coffey Northumbrian)

McCurtains Villas: Give/Take in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

College Road: Stop/Go in operation 0930-1600hrs to facilitate pavement reinstatement (Virgin Media)

Geaneys Boreen / St John’s Well: Stop/Go in operation 0930-1800hrs to facilitate underground service work (Deermount Construction)

South Main Street: Cycle Lane Closure in place 0930-1800hrs to facilitate ESB ducting works for Beamish and Crawford redevelopment (DW Utilities)

Farranferris Avenue: Road Closure in place (Eastbound Only) from 0930hrs on the Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Farranferris Green to its junction with Seminary Walk (Lagan Asphalt)

Wellington Bridge / Sundays Well Road Junction: Stop/Go in operation 1930-0600hrs to facilitate junction upgrade works (Sorensen Civil Engineering)

Coach Street: Road Closure in place 0930-1700hrs from its junction with Henry Street to its junction with Thomas Street to facilitate ESB pole replacement works (TLI Group)

Seminary Walk: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works. Cushings Road and Tannery gardens will also be affected as part of the works (TLI Group)

Old Mallow Road / Fitz Boreen: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works (TLI Group)

John Redmond Street: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works. Dominick Street will also be affected as part of the works (TLI Group)

Tuesday 02nd of April 2019

****Barrack Street****: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 03rd of May 2019 from its junction with Noonan Road to its junction with Reeds Square to facilitate ducting works, Local access to be maintained (MGOS)

St. Patrick`s Quay: Lane restriction in place from 0930hrs on Monday 28th of January for approximately a six week period to facilitate paving works for Harley Street Pedestrian bridge. Harley Street will also be closed as part of the works for the same period (L&M Keating)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out:

·         Mon-Wed: 0930-1430hrs & 1930-0600hrs

·         Thur-Friday: 2200-0600hrs

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

***Summerhill North/ MacCurtain Street Junction***: Two Way Stop/Go in operation 2000-0600hrs to facilitate laying of the watermain across the junction (Coffey Northumbrian)

Pine Street: Road closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Devonshire Street to its junction with Camden Place to facilitate water main installation works (Coffey Northumbrian)

Father Mathew Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Friars Walk to its junction with O Connell Avenue (Coffey Northumbrian)

Upper Friars Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Mount Pleasant Road to facilitate water main works (Coffey Northumbrian)

Hawthorn Villas, South Douglas Road: Stop/Go in operation 1930-0600hrs to facilitate water connection works (Coffey Northumbrian)

Lower Glanmire Road: Lane restriction in operation by Supermacs to facilitate footpath snagging works (Coffey Northumbrian)

South Main Street: Cycle Lane Closure in place 0930-1800hrs to facilitate ESB ducting works for Beamish and Crawford redevelopment (DW Utilities)

McCurtains Villas: Give/Take in operation 0800-1800hrs to facilitate broadband ducting works (Virgin Media)

Geaneys Boreen / St John’s Well: Stop/Go in operation 0930-1800hrs to facilitate underground service work (Deermount Construction)

Farranferris Avenue: Road Closure in place (Eastbound Only) from 0930hrs on the Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Farranferris Green to its junction with Seminary Walk (Lagan Asphalt)

Wellington Bridge / Sundays Well Road Junction: Stop/Go in operation 1930-0600hrs to facilitate junction upgrade works (Sorensen Civil Engineering)

College Road / McCurtain Villas: Three way Stop/Go in operation 0930-1600hrs to facilitate water leak repair (Water / CCC)

Redemption Road: Stop/Go in operation 0930-1700hrs to facilitate ESB pole replacement works (TLI Group)

Wolfetone Street: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works. Fair Street will also be affected as part of the works. (TLI Group)

Wednesday 03rd of April 2019

****Barrack Street****: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 03rd of May 2019 from its junction with Noonan Road to its junction with Reeds Square to facilitate ducting works, Local access to be maintained (MGOS)

St. Patrick`s Quay: Lane restriction in place from 0930hrs on Monday 28th of January for approximately a six week period to facilitate paving works for Harley Street Pedestrian bridge. Harley Street will also be closed as part of the works for the same period (L&M Keating)

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

***Summerhill North/ MacCurtain Street Junction***: Two Way Stop/Go in operation 2000-0600hrs to facilitate laying of the watermain across the junction (Coffey Northumbrian)

Pine Street: Road closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Devonshire Street to its junction with Camden Place to facilitate water main installation works (Coffey Northumbrian)

Father Mathew Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Friars Walk to its junction with O Connell Avenue (Coffey Northumbrian)

Upper Friars Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Mount Pleasant Road to facilitate water main works (Coffey Northumbrian)

Hawthorn Villas, South Douglas Road: Stop/Go in operation 1930-0600hrs to facilitate water connection works (Coffey Northumbrian)

Lower Glanmire Road: Lane restriction in operation by Supermacs to facilitate footpath snagging works (Coffey Northumbrian)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out:

·         Mon-Wed: 0930-1430hrs & 1930-0600hrs

·         Thur-Friday: 2200-0600hrs

McCurtains Villas: Give/Take in operation 0800-1800hrs to facilitate broadband ducting works (Virgin Media)

Geaneys Boreen / St John’s Well: Stop/Go in operation 0930-1800hrs to facilitate underground service work (Deermount Construction)

South Main Street: Cycle Lane Closure in place 0930-1800hrs to facilitate ESB ducting works for Beamish and Crawford redevelopment (DW Utilities)

Farranferris Avenue: Road Closure in place (Eastbound Only) from 0930hrs on the Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Farranferris Green to its junction with Seminary Walk (Lagan Asphalt)

Wellington Bridge / Sundays Well Road Junction: Stop/Go in operation 1930-0600hrs to facilitate junction upgrade works (Sorensen Civil Engineering)

Grattan Street: Stop/Go in operation 1930-0600hrs to facilitate manhole survey (MMD Construction)

College Road /Sunview Terrace Junction: Three way Stop/Go in operation 0930-1600hrs to facilitate water leak repair (Water / CCC)

Richmond Hill: Road Closure in place 1930-0030hrs from its junction with Hardwick Street to its junction with the Old Youghal Road to facilitate broadband ducting works. Local Access to be maintained (Siro)

Cotter Street: Road Closure in place from 1930-06000hrs from its junction with South Terrace to its junction with Copley Street to facilitate building facade works (John Paul Construction)

Coach Street: Road Closure in place 0930-1700hrs from its junction with Henry Street to its junction with Thomas Street to facilitate ESB pole replacement works (TLI Group)

Old Market Place: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works (TLI Group)

Thursday 04th of April 2019

****Barrack Street****: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 03rd of May 2019 from its junction with Noonan Road to its junction with Reeds Square to facilitate ducting works, Local access to be maintained (MGOS)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out:

·         Mon-Wed: 0930-1430hrs & 1930-0600hrs

·         Thur-Friday: 2200-0600hrs

St. Patrick`s Quay: Lane restriction in place from 0930hrs on Monday 28th of January for approximately a six week period to facilitate paving works for Harley Street Pedestrian bridge. Harley Street will also be closed as part of the works for the same period (L&M Keating)

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

***Summerhill North/ MacCurtain Street Junction***: Two Way Stop/Go in operation 2200-0600hrs to facilitate laying of the watermain across the junction (Coffey Northumbrian).

Pine Street: Road closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Devonshire Street to its junction with Camden Place to facilitate water main installation works (Coffey Northumbrian)

Father Mathew Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Friars Walk to its junction with O Connell Avenue (Coffey Northumbrian)

Upper Friars Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Mount Pleasant Road to facilitate water main works (Coffey Northumbrian)

Lower Glanmire Road: Lane restriction in operation by Supermacs to facilitate footpath snagging works (Coffey Northumbrian)

O Connell Avenue: Road Closure in place from 0930hrs on Thursday 04th of April until 1800hrs on Friday 05th of April to facilitate permanent reinstatement works post water main works (Coffey Northumbrian)

Hawthorn Villas, South Douglas Road: Stop/Go in operation 1930-0600hrs to facilitate water connection works (Coffey Northumbrian)

South Main Street: Cycle Lane Closure in place 0930-1800hrs to facilitate ESB ducting works for Beamish and Crawford redevelopment (DW Utilities)

Geaneys Boreen / St John’s Well: Stop/Go in operation 0930-1800hrs to facilitate underground service work (Deermount Construction)

Farranferris Avenue: Road Closure in place (Eastbound Only) from 0930hrs on the Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Farranferris Green to its junction with Seminary Walk (Lagan Asphalt)

Wellington Bridge / Sundays Well Road Junction: Stop/Go in operation 1930-0600hrs to facilitate junction upgrade works (Sorensen Civil Engineering)

Blackrock Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

Lee Road/Sundays Well Road: Stop/Go in operation 0930-1600hrs to facilitate ESB pole replacement works (TLI Group)

Friday 05th of April 2019

****Barrack Street****: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 03rd of May 2019 from its junction with Noonan Road to its junction with Reeds Square to facilitate ducting works, Local access to be maintained (MGOS)

St. Patrick`s Quay: Lane restriction in place from 0930hrs on Monday 28th of January for approximately a six week period to facilitate paving works for Harley Street Pedestrian bridge. Harley Street will also be closed as part of the works for the same period (L&M Keating)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out:

·         Mon-Wed: 0930-1430hrs & 1930-0600hrs

·         Thur-Friday: 2200-0600hrs

MacCurtain Street: Lane restriction in place to facilitate water main installation on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

***Summerhill North/ MacCurtain Street Junction***: Two Way Stop/Go in operation 2200-0600hrs to facilitate laying of the watermain across the junction (Coffey Northumbrian)

Pine Street: Road closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Devonshire Street to its junction with Camden Place to facilitate water main installation works (Coffey Northumbrian)

Father Mathew Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Friars Walk to its junction with O Connell Avenue (Coffey Northumbrian)

Upper Friars Road: Road Closure in place from 0930hrs on Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Mount Pleasant Road to facilitate water main works (Coffey Northumbrian)

O Connell Avenue: Road Closure in place from 0930hrs on Thursday 04th of April until 1800hrs on Friday 05th of April to facilitate permanent reinstatement works post water main works (Coffey Northumbrian)

Hawthorn Villas, South Douglas Road: Stop/Go in operation 1930-0600hrs to facilitate water connection works (Coffey Northumbrian)

Lower Glanmire Road: Lane restriction in operation by Supermacs to facilitate footpath snagging works (Coffey Northumbrian)

South Main Street: Cycle Lane Closure in place 0930-1800hrs to facilitate ESB ducting works for Beamish and Crawford redevelopment (DW Utilities)

McCurtains Villas: Give/Take in operation 0800-1800hrs to facilitate broadband ducting works (Virgin Media)

Geaneys Boreen / St John’s Well: Stop/Go in operation 0930-1800hrs to facilitate underground service work (Deermount Construction)

Farranferris Avenue: Road Closure in place (Eastbound Only) from 0930hrs on the Monday 01st of April until 1800hrs on Friday 05th of April 2019 from its junction with Farranferris Green to its junction with Seminary Walk (Lagan Asphalt)

Wellington Bridge / Sundays Well Road Junction: Stop/Go in operation 1930-0600hrs to facilitate junction upgrade works (Sorensen Civil Engineering)

Rose Hill Upper: Road Closure in place from 0930-1700hrs from its junction with the Sundays Well Road to facilitate ESB Pole replacement Works, Local Access to be maintained (TLI Group)

Road Closures due to Events

************************************************************************************************

Cork City Council thanks you for your co-operation and apologises for the disruption that may be caused by these works. 

************************************************************************************************