Road Closure List - 19th July 2019

.

Ongoing Road Closures and Diversions

North Main Street: Emergency Road closure in place until further notice to facilitate remedial works to No.63 North Main Street. (Loftus Demolition)

  • No right turn from Adelaide Street onto North Main Street
  • Temporary right hand turn from Kyle street onto North Main Street is in operation

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 19th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Sawmill Street: Road Closure in place westbound only, until October 2019, from its junction with Rutland Street and Junction with White Street, to facilitate Rutland Square Social Housing Development (O’Shea Builders)

Carbery Grove, Knocknaheeny: Road closure in place form 0930hrs on Monday the 2nd of July 2018 until Friday 21st of July 2019 on Carbery Grove (Between its Junction with Harbour View Road and Junction with Ardmore Avenue at the rear of Bernardos Brighter Future Centre) as part of the City Northwest Quarter Regeneration Scheme Phase 2A. (Murnane & O’Shea)

  • Access for residents on Carbery Grove will be via a new temporary road entering/existing on Ardmore Avenue for this period.
  • A new temporary entrance/exist will be provided from Dunmanus Park for residents of 98-110A Harbour View Road.

Millerd Street: Road Closure in place from Friday 22nd of March 2019 until March 2020 from its junction with Francis Street to its junction with Henry Street to facilitate apartment block redevelopment (Vision Contracting)

Coleman’s Lane: Road Closure in place from Monday 15th of April 2019 until 31st of July 2020 from its junction with Grattan Street to its junction with North Main Street to facilitate apartment block redevelopment (MMD Construction)

St. Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 26th of July to facilitate water main installation works (Ward and Burke)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Daily Road Closures and Diversions

Friday 19th of July 2019

St. Patricks Quay Bus Bay 1 & Bus Bay 2 Closure: To facilitate the installation of the eastern Strategic Trunk Water main on St Patricks Quay. Bus bay 1 & Bus Bay 2 will be closed for pickups and drops offs from 0600hrs on the morning of the 19th of July for a four week period until Friday the 16th of August. All coach operator activities will be moved to Alfred Street for that period inclusive. (Ward & Burke Ltd)

Saturday 20th of July 2019

St. Patricks Quay Bus Bay 1 & Bus Bay 2 Closure: To facilitate the installation of the eastern Strategic Trunk Water main on St Patricks Quay. Bus bay 1 & Bus Bay 2 will be closed for pickups and drops offs from 0600hrs on the morning of the 19th of July for a four week period until Friday the 16th of August. All coach operator activities will be moved to Alfred Street for that period inclusive. (Ward & Burke Ltd)

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Wolfe Tone Street / North Monastery Road Junction: Four-way Stop/Go in operation 0930-2100hrs to facilitate ESB cabling works (ESB / David Nodwell)

Mardyke Walk: Road Closure in place from 0800hrs on Saturday 20th of July until 2100hrs on Sunday 21st of July 2019 from its junction with Dyke Parade to its junction with Western Road to facilitate the Laya Spectacular in Fitzgeralds Park


Sunday 21st of July 2019

St. Patricks Quay Bus Bay 1 & Bus Bay 2 Closure: To facilitate the installation of the eastern Strategic Trunk Water main on St Patricks Quay. Bus bay 1 & Bus Bay 2 will be closed for pickups and drops offs from 0600hrs on the morning of the 19th of July for a four week period until Friday the 16th of August. All coach operator activities will be moved to Alfred Street for that period inclusive. (Ward & Burke Ltd)

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Wellington Road / St Patricks Place: Stop / Go in operation 0800-1800hrs to facilitate ESB Span change (ESB / Siro)

Wolfe Tone Street / North Monastery Road Junction: Four-way Stop/Go in operation 0930-2100hrs to facilitate ESB cabling works (ESB / David Nodwell)

Mardyke Walk: Road Closure in place from 0800hrs on Saturday 20th of July until 2100hrs on Sunday 21st of July 2019 from its junction with Dyke Parade to its junction with Western Road to facilitate the Laya Spectacular in Fitzgeralds Park


Monday 22nd July 2019

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

South Main Street: Lane Restriction in operation 0930-1600hrs to facilitate gas connection works to Beamish & Crawford redevelopment (BBCLG / GNI)

Skehard Road: Stop/Go in operation from 0930-1600hr from Oakdene to Bessboro Road junction to facilitate water main installation. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 26th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Mercier Park: Road closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July 2019 to facilitate water main installation works (Coffey Northumbrian)

Doyle Road: Stop/Go in operation 0930-1800hrs to facilitate water main works (Coffey Northumbrian)

St Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 04th August to facilitate water main installation works (Ward and Burke)

Spring Lane: Road Closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July from its junction with Thomas Davis Street to its junction with Ballincollie Road to facilitate water main installation, Local access will be maintained via the Ballincollie Road end of the works. (Ward & Burke Ltd)

East Douglas Street: Stop/Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Wolfe Tone Street: Road Closure 0930-1800hrs in place from its junction with North Monastery Road to its junction with Cathedral Road to facilitate ESB cabling works. Local access to be maintained (ESB / David Nodwell)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Tracton Lawn: Stop/Go in operation 0830-1600hrs from Monday 22nd of July until Friday 26th of July 2019 to facilitate manhole repair (Drainage / CCC)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Church Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Mallow Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Whitechurch Road: Stop/Go in operation 0930-1800hrs to facilitate broadband ducting works (K&N Group)

Tuesday 23rd of July 2019

***Jack Lynch Tunnel*** : Full Tunnel closure in place from 2100-0500hrs from Junction 10 Mahon Exit to its junction with the Dunkettle Interchagne  to faciliate maintenance works.

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

South Main Street: Lane Restriction in operation 0930-1600hrs to facilitate gas connection works to Beamish & Crawford redevelopment (BBCLG / GNI)

Skehard Road: Stop/Go in operation from 0930-1600hr at Bessboro Road junction to facilitate water main installation. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 26th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Mercier Park: Road closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July 2019 to facilitate water main installation works (Coffey Northumbrian)

Doyle Road: Stop/Go in operation 0930-1800hrs to facilitate water main works (Coffey Northumbrian)

St. Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 04th August to facilitate water main installation works (Ward and Burke)

Spring Lane: Road Closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July from its junction with Thomas Davis Street to its junction with Ballincollie Road to facilitate water main installation, Local access will be maintained via the Ballincollie Road end of the works. (Ward & Burke Ltd)

Rochestown Road: Stop/Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Wolfe Tone Street: Road Closure 0930-1800hrs in place from its junction with North Monastery Road to its junction with Cathedral Road to facilitate ESB cabling works. Local access to be maintained (ESB / David Nodwell)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Tracton Lawn: Stop/Go in operation 0830-1600hrs from Monday 22nd of July until Friday 26th of July 2019 to facilitate manhole repair (Drainage / CCC)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Church Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Mallow Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Whitechurch Road: Stop/Go in operation 0930-1800hrs to facilitate broadband ducting works (K&N Group)

Wednesday 24th of July 2019

***Jack Lynch Tunnel*** : Full Tunnel closure in place from 2100-0500hrs from Junction 10 Mahon Exit to its junction with the Dunkettle Interchagne  to faciliate maintenance works.

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

South Main Street: Lane Restriction in operation 0930-1600hrs to facilitate gas connection works to Beamish & Crawford redevelopment (BBCLG / GNI)

Skehard Road: Stop/Go in operation from 0930-1600hr at Bessboro Road junction to facilitate water main installation. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 26th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Barringtons Avenue: Road Closure in place 0930-1800hrs from its junction with the Blackrock Road to facilitate reinstatement works post lead replacement works (Coffey Northumbrian)

York Hill: Road Closure in place 1930-0600hrs to facilitate testing of new water main section (Coffey Northumbrian)

St. Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 04th August to facilitate water main installation works (Ward and Burke)

Spring Lane: Road Closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July from its junction with Thomas Davis Street to its junction with Ballincollie Road to facilitate water main installation, Local access will be maintained via the Ballincollie Road end of the works. (Ward & Burke Ltd)

Lime Tree Road: Stop/Go in operation 0800-1800hrs to facilitate broadband ducting works (Siro)

Wolfe Tone Street: Road Closure 0930-1800hrs in place from its junction with North Monastery Road to its junction with Cathedral Road to facilitate ESB cabling works. Local access to be maintained (ESB / David Nodwell)

Victoria Cross: Lane restriction in operation 1930-2330hrs outbound only to facilitate water leak repair (Water / CCC)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Tracton Lawn: Stop/Go in operation 0830-1600hrs from Monday 22nd of July until Friday 26th of July 2019 to facilitate manhole repair (Drainage / CCC)

Blackrock Road: Stop/Go in operation 0930-1600hrs to faciliate gas connection works (BBCLG / GNI)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Church Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Blackrock Road: Stop/Go in operation 0930-1600hrs to faciliatate broadband ducting works (K&N Group)

Old Mallow Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Whitechurch Road: Stop/Go in operation 0930-1800hrs to facilitate broadband ducting works (K&N Group)

Thursday 25th of July 2019

***Jack Lynch Tunnel*** : Full Tunnel closure in place from 2100-0500hrs from Junction 10 Mahon Exit to its junction with the Dunkettle Interchagne  to faciliate maintenance works.

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

South Main Street: Lane Restriction in operation 0930-1600hrs to facilitate gas connection works to Beamish & Crawford redevelopment (BBCLG / GNI)

Skehard Road: Stop/Go in operation from 0930-1600hr at Bessboro Road junction to facilitate water main installation. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 26th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Mercier Park: Road closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July 2019 to facilitate water main installation works (Coffey Northumbrian)

Doyle Road: Stop/Go in operation 0930-1800hrs to facilitate water main works (Coffey Northumbrian)

St Patricks Hill: Road Closure in place 1930-0600hrs from its junction with MacCurtain Street to its junction with Hardwick Street to facilitate testing of new water main section (Coffey Northumbrian)

St. Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 04th August to facilitate water main installation works (Ward and Burke)

Spring Lane: Road Closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July from its junction with Thomas Davis Street to its junction with Ballincollie Road to facilitate water main installation, Local access will be maintained via the Ballincollie Road end of the works. (Ward & Burke Ltd)

Maryborough Hill: Stop/Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Wolfe Tone Street: Road Closure 0930-1800hrs in place from its junction with North Monastery Road to its junction with Cathedral Road to facilitate ESB cabling works. Local access to be maintained (ESB / David Nodwell)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Tracton Lawn: Stop/Go in operation 0830-1600hrs from Monday 22nd of July until Friday 26th of July 2019 to facilitate manhole repair (Drainage / CCC)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Church Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Mallow Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Whitechurch Road: Stop/Go in operation 0930-1800hrs to facilitate broadband ducting works (K&N Group)

Friday 26th of July 2019

L2998 Ballinglanna: Temporary traffic management will be in operation for approx a four week period on the L2998 from its junction with Glanmire Bridge to its junction with Glashaboy Waterworks., expect delays

Temporary traffic management measures include the following:

  • Stop/Go operated by Flagmen at peak hours 0700-0930hrs 1600-1830hrs
  • Temporary traffic lights in operation during off peak hours

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

South Main Street: Lane Restriction in operation 0930-1600hrs to facilitate gas connection works to Beamish & Crawford redevelopment (BBCLG / GNI)

Great William O Brien Street: Lane restriction in operation 0930-1800hrs to facilitate sewer repair (MGOS)

Parklands Drive / Park View Estate: Stop/ Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Skehard Road: Stop/Go in operation from 0930-1600hr at Bessboro Road junction to facilitate water main installation. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 26th of July from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Mercier Park: Road closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July 2019 to facilitate water main installation works (Coffey Northumbrian)

Doyle Road: Stop/Go in operation 0930-1800hrs to facilitate water main works (Coffey Northumbrian)

St. Patrick’s Quay: Lane restriction in place 0930hr Monday 01st July until 2000hr Friday 04th August to facilitate water main installation works (Ward and Burke)

Spring Lane: Road Closure in place from 0930hrs on Monday 22nd of July until 1800hrs on Friday 26th of July from its junction with Thomas Davis Street to its junction with Ballincollie Road to facilitate water main installation, Local access will be maintained via the Ballincollie Road end of the works. (Ward & Burke Ltd)

Gurranebraher Road / Cathedral Road Junction: Stop/Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Gurranebraher Road / Blarney Street Junction: Stop/Go in operation 0930-1600hrs to facilitate broadband ducting works (Siro)

Wolfe Tone Street: Road Closure 0930-1800hrs in place from its junction with North Monastery Road to its junction with Cathedral Road to facilitate ESB cabling works. Local access to be maintained (ESB / David Nodwell)

Victoria Road: Lane restriction in operation 0930-1800hrs to facilitate broadband ducting works (Virgin Media)

Tracton Lawn: Stop/Go in operation 0830-1600hrs from Monday 22nd of July until Friday 26th of July 2019 to facilitate manhole repair (Drainage / CCC)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Church Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Mallow Road: Stop/Go in operation 0930-1600hrs to faciliate broadband ducting works (K&N Group)

Old Whitechurch Road: Stop/Go in operation 0930-1800hrs to facilitate broadband ducting works (K&N Group)

N40 Special Speed Limit Reductions:

A 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N40 South Ring Road Westbound from the top of the Kinsale Flyover to a point 300m west of where the Togher merge lane meets the N40 and including merge ramps from the Kinsale Road Roundabout taking vehicles westbound on the N40.

The proposed Westbound special speed limit order will apply temporary speed limits at the above location from Site 6: 24th June 2019 to the 30th August 2019

A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N40 South Ring Road Eastbound from where the merge lane from the Bandon Road Roundabout  meets the N40, to a point 150m east of where the Sarsfield Road Roundabout merge lane meets the N40. Eastbound Merge and Diverge lanes at the Sarsfield road roundabout are to be included

The proposed Eastbound special speed limit order will apply temporary speed limits at the above location from Site 5: 2nd July 2019 to the 20th September 2019

Road Closures due to Events

************************************************************************************************

Cork City Council thanks you for your co-operation and apologises for the disruption that may be caused by these works. 

************************************************************************************************