**N40 Westbound**: Partial closure of Auxiliary Lane in place from 0930 Monday 01st of March 2021 until 1600hrs Friday 30th of April 2021 to facilitate ITS site works (Jons)
**N25 Eastbound and Westbound**: Lane restrictions in place until Friday 02nd of July 2021 to facilitate Dunkettle Interchange Upgrade site works (Sisks)
Coleman’s Lane: Road Closure in place from Monday 15th of April 2019 until June 2021 from its junction with Grattan Street to its junction with North Main Street to facilitate apartment block redevelopment (MMD Construction)
John Philpott Curran Street: Road closure in place from 0930hrs on Monday 11th of November 2019 from its junction with Shandon Street to its junction with Cathedral Avenue to facilitate the redevelopment of No. 5/6 Shandon Street. Works have been stopped due to Covid 19 restrictions. Following the resumption of works a new completion date will be decided. (Cumnor Construction)
***York Street***: Road Closure in place from 2000hrs on Monday 06th of January 2020 from its junction with McCurtain Street to its junction with Wellington Road to facilitate the development of the Windsor Inn Hotel. Works have been stopped due to Covid 19 restrictions. Following the resumption of works a new completion date will be decided. (Townmore Construction)
York Hill: Road closure in place (Southbound Only) 2000hrs on Monday 06th of January 2020 from its junction with Summerhill North to its junction with Wellington Road to facilitate one way system due to the York Street road closure. Works have been stopped due to Covid 19 restrictions. Following the resumption of works a new completion date will be decided. (Townmore Construction)
Deane Street: Road closure in place from 0930hrs on Tuesday 25th of February 2020 until June 2021 approx from is junction with Oliver Plunkett Street Lower to its junction with Clontarf Street to facilitate development of the Prism Building by CField Construction.
Henry Street: Road closure in operation 24hr from its junction with Prospect Row to its junction with Millerd Street to facilitate additional storage facilities due Covid-19 (Mercy Hospital)
Skehard Road: Upgrade works taking place until approx July 2021 from its junction with Mahon Link Road to its junction with Church Road, Lane restrictions and Stop/Go traffic management will be in place expect delays. Footpath closures will be in place throughout the works (Coffey Northumbrian)
Blarney Road/Harbour View Road: Footpath closures in place until February 2021, to facilitate upgrade works. Pedestrians to follow diversions. Works have been stopped due to Covid 19 restrictions. Following the resumption of works a new completion date will be decided. (Cumnor)
Sheares Street: Partial bus lane closure in place from 23rd of February 2021 until October 2021 to facilitate Mercy Hospital extension works. A temporary pedestrian walkway will be in place for the duration. (ESS Modular)
Covid-19 Pathway Recovery Road Closures
The Marina: Road Closure in place to all public vehicular traffic. The closure is in place from its entrance with Páirc Uí Chaoimh to its junction with Church Avenue.
Cork City Council would ask for the public’s cooperation when parking and to be cognisant of driveway access for residents in the area if availing of the Marina walkway.
Paul Street / St Peter and Pauls Place: Road Closure in place to facilitate social distancing measures. A full road closure is in place on St Peter and Pauls Place from its junction with St Pauls Avenue. Paul Street will be local access only for people looking to access St Pauls Avenue. (CCC/ Traffic)
Tuckey Street: Road Closure in place from its junction with Grand Parade to its junction with South Main Street to facilitate social distancing measures. (CCC/ Traffic)
Pembroke Street: Road Closure in place from its junction with South Mall to its junction with Oliver Plunkett Street to facilitate social distancing measures. Access to Phoenix Street and Smith Street maintained via Crane Lane new one-way system. (CCC/ Traffic)
Princes Street: Road closure in place from its junction with South Mall to its junction with Oliver Plunkett Street to facilitate social distancing measures (CCC/ traffic)
Emmet Place: Road closure in place from its junction with Drawbridge Street and Lavitt’s Quay to facilitate social distancing measures. New two-way system in place between its junction with Drawbridge Street and Crawford Art Gallery Entrance for local access only (CCC/ traffic)
Little Ann Street: Road closure in place from its junction with Washington Street to its junction with Hanover Street to facilitate social distancing measures. (CCC/ traffic)
Little Cross Street: Road closure in place from its junction with Washington Street to its junction with Hanover Street to facilitate social distancing measures. (CCC/ traffic)
Speed Limit Order
***N40 South Ring***:In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the N40 Westbound & Eastbound as per the synopsis below:
1. N40 Mainline Westbound:
2. N40 Mainline Eastbound:
3. N40 Junction 10 Mahon Eastbound on Slip:
4. N40 Junction 10 Mahon Eastbound off Slip:
5. N40 Junction 10 Mahon Westbound on Slip:
6. N40 Junction 10 Mahon Eastbound off Slip:
The proposed special speed limit order will apply temporary speed limits at the above location from 25th of January 2021 until 26th of August 2021
***M8/N8/N25/N40 Dunkettle Interchange***: In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the Dunkettle Interchange M8/N8/N25/N40 and associated slip roads. as per the synopsis below:
1. N25/N8 Mainline Westbound:
2. N8/N25 Mainline Eastbound:
3. M8/N40 Mainline Southbound:
4. N40/M8 Mainline Northbound:
5. R623 Off Ramp:
6. N25/M8 Slip Road Northbound:
7. N8/N40 Slip Road Southbound:
8. N40/N25 Slip Road Eastbound:
9. M8/N8 Slip Road Westbound:
10. L-3004 Merge/Diverge Slip Roads:
The proposed special speed limit order will apply temporary speed limits at the above location from 10th February 2021 until 27th January 2022
*** M8 Mainline ***: In accordance with Section 10 of the Road Traffic Act, 2004 Cork City Council hereby wishes to advise that a Road Works Speed Limit Order has been made on the M8 Motorway Northbound and Southbound as per the synopsis below:
1. M8 Mainline Southbound:
2. M8 Mainline Northbound:
The proposed special speed limit order will apply temporary speed limits at the above location from 22nd of February 2021 until 03rd of September 2021
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 from to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Infirmary Road: Lane restrictions in place from 0930-1600hrs to facilitate water and sewer connection works. (Coffey Northumbrian)
Old Fort Road/Willow Drive, Ballincollig: Stop/Go in place 0930-1400hrs and 1530-1800hrs to facilitate water connection works. (Coffey Northumbrian)
Ringmahon Road: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Bleasbys Street: Road Closure in place from 0800hrs Monday 12th of April 2021 until 1700hrs Friday 16th of April 2021 from its junction with Gerald Griffin Street to its junction with Watercourse Road to facilitate scaffold removal. Local diversions will be in place. Local access will be maintained. (Cahalane)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Courtown Drive: Stop/Go in place 0930-1600hrs to facilitate underground telecom duct works. (KNN)
Grange Road: Lane restrictions in place 24hrs to facilitate footpath repair works. Footpath closures will also be in place. Diversion routes will be in place. (CEM)
Oliver Plunkett Street: Road Closure in place from 0930-1900hrs from its junction with Parnell Place to its junction with Grand Parade to facilitate road resurfacing works. All side streets will be affected as a result of the works. Local Diversions will be in place (Lagan)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Lower Kileens Road/Upper Fairhill/Commons Road: Temporary traffic lights will be in place over the weekend expect delays. (Cumnor)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Lower Kileens Road/Upper Fairhill/Commons Road: Temporary traffic lights will be in place over the weekend expect delays. (Cumnor)
***M8 Southbound***: Lane Restrictions in place from 2100-0500hrs to facilitate installation of wire rope barrier. (Jons)
***N40 Dunkettle Interchange***: Lane Restrictions in place 24hrs until the 7th of May to facilitate interchange upgrade works. (Sisk)
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Old Mallow Road: Stop/Go in place 0930-1600hrs to facilitate water connection works. (Coffey Northumbrian)
Infirmary Road: Lane restrictions in place from 0930-1600hrs to facilitate water and sewer connection works. (Coffey Northumbrian)
Dublin Hill: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Oliver Plunkett Street: Road Closure in place from 0930-1900hrs from its junction with Parnell Place to its junction with Grand Parade to facilitate road resurfacing works. All side streets will be affected as a result of the works. Local Diversions will be in place (Lagan)
Hanover Street: Road Closure in place from 0930-1900hrs from its junction with Washington Street to its junction with South Main Street to facilitate road resurfacing works. Local Diversions will be in place (Lagan)
N22 Carrigrohane Road/Church Hill: Stop/Go in place 0930-1600hrs to facilitate overhead broadband works. (CBE)
Railway Street: Road Closure, Northbound only, in place from 0930-1600hrs from its junction with Horgan’s Quay to its junction with Alfred Street to facilitate road resurfacing works. Local Diversions will be in place (BBClg)
Station Road, Ballincollig: Stop/Go in place 1930-0000hrs to facilitate underground telecom duct works. (KNN)
Spur Hill: Temporary Traffic lights in place 0930-1600hrs to facilitate underground telecom duct works. (KNN)
Lower Kileens Road/Upper Fairhill/Commons Road: Stop/Go in place 0800-1800hrs to facilitate bridge repair and rehabilitation works. Temporary traffic lights will be in place outside of work hours expect delays. (Cumnor)
Mulgrave Road: Stop/Go in place 1900-0600hrs to facilitate survey works. (Farrans)
North Mall: Stop/Go in place 1900-0600hrs to facilitate survey works. (Farrans)
Popes Quay: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
***Jack Lynch Tunnel***: Full tunnel closure in operation 2100-0400hrs to facilitate routine maintenance works. The closure will be in place from J10 Mahon to its junction with the Dunkettle Roundabout (ERTO)
***N40 Dunkettle Interchange***: Lane Restrictions in place 24hrs until the 7th of May to facilitate interchange upgrade works. (Sisk)
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Old Mallow Road: Stop/Go in place 0930-1600hrs to facilitate water connection works. (Coffey Northumbrian)
Infirmary Road: Lane restrictions in place from 0930-1600hrs to facilitate water and sewer connection works. (Coffey Northumbrian)
Dublin Hill: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place 0930-1600hrs to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Oliver Plunkett Street: Road Closure in place from 0930-1900hrs from its junction with Parnell Place to its junction with Grand Parade to facilitate road resurfacing works. All side streets will be affected as a result of the works. Local Diversions will be in place (Lagan)
Oakfield Avenue: Stop/Go in place from 0930-1900hrs to facilitate road resurfacing works. (Lagan)
R608 Carrigrohane Road: Stop/Go in place 0930-1600hrs to facilitate overhead broadband works. (CBE)
Togher Road: Road Closure in place from 1930-0130hrs, from its junction with Tramore Road Roundabout to its junction with Clashduv Road, to facilitate watermain repair works. (CCC/Water)
Railway Street: Road Closure, Northbound only, in place from 0930-1600hrs from its junction with Horgan’s Quay to its junction with Alfred Street to facilitate road resurfacing works. Local Diversions will be in place (BBClg)
Grand Parade: Stop/Go in place 1930-0600hrs to facilitate underground cable pulling works. (Virgin)
Washington Street: Lane Restrictions in place 2100-0600hrs to facilitate underground cable pulling works. (Virgin)
Lower Kileens Road/Upper Fairhill/Commons Road: Stop/Go in place 0800-1800hrs to facilitate bridge repair and rehabilitation works. Temporary traffic lights will be in place outside of work hours expect delays. (Cumnor)
North Mall: Stop/Go in place 1900-0600hrs to facilitate survey works. (Farrans)
Lee Road: Stop/Go in place 1900-0600hrs to facilitate survey works. (Farrans)
Popes Quay: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
Sundays Well Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
***Jack Lynch Tunnel***: Full tunnel closure in operation 2100-0400hrs to facilitate routine maintenance works. The closure will be in place from J10 Mahon to its junction with the Dunkettle Roundabout (ERTO)
***N40 Dunkettle Interchange***: Lane Restrictions in place 24hrs until the 7th of May to facilitate interchange upgrade works. (Sisk)
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Marina Park: Stop/Go in place 0930-1600hrs to facilitate water connection works. (Coffey Northumbrian)
Dublin Hill: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Oliver Plunkett Street: Road Closure in place from 0930-1900hrs from its junction with Parnell Place to its junction with Grand Parade to facilitate road resurfacing works. All side streets will be affected as a result of the works. Local Diversions will be in place (Lagan)
Oakfield Avenue: Stop/Go in place from 0930-1900hrs to facilitate road resurfacing works. (Lagan)
College Road: Stop/Go in place 0930-1600hrs to facilitate overhead broadband works. (CBE)
Railway Street: Road Closure, Northbound only, in place from 0930-1600hrs from its junction with Horgan’s Quay to its junction with Alfred Street to facilitate road resurfacing works. Local Diversions will be in place (BBClg)
Lower Kileens Road/Upper Fairhill/Commons Road: Stop/Go in place 0800-1800hrs to facilitate bridge repair and rehabilitation works. Temporary traffic lights will be in place outside of work hours expect delays. (Cumnor)
Lee Road: Stop/Go in place 1900-0600hrs to facilitate survey works. (Farrans)
Sundays Well Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
***Jack Lynch Tunnel***: Full tunnel closure in operation 2100-0400hrs to facilitate routine maintenance works. The closure will be in place from J10 Mahon to its junction with the Dunkettle Roundabout (ERTO)
***N40 Dunkettle Interchange***: Lane Restrictions in place 24hrs until the 7th of May to facilitate interchange upgrade works. (Sisk)
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Marina Park: Stop/Go in place 0930-1600hrs to facilitate water connection works. (Coffey Northumbrian)
Park Avenue: Road Closure in place from 1930-0600hrs from its junction with Monaghan Road to its junction with Blackrock Road to facilitate watermain repair works. Local Diversions will be in place (Coffey Northumbrian)
Dublin Hill: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Maylor Street: Road Closure in place from 0930-1900hrs from its junction with St Patrick Street to its junction with Parnell Place to facilitate road resurfacing works. Local Diversions will be in place (Lagan)
Cook Street: Road Closure in place from 0930-1900hrs from its junction with Oliver Plunket Street to its junction with South Mall to facilitate road resurfacing works. Local Diversions will be in place (Lagan)
Oakfield Avenue: Stop/Go in place from 0930-1900hrs to facilitate road resurfacing works. (Lagan)
College Road: Stop/Go in place 0930-1600hrs to facilitate overhead broadband works. (CBE)
Dorgans Road: Road Closure in place from 0930-1600hrs from its junction with Magazine Road to its junction with Glasheen Road to facilitate road resurfacing works. Local Diversions will be in place (BBClg)
Coach Street: Road Closure in place from 1100-1600hrs from its junction with Peter Street to its junction with Henry Street to facilitate road resurfacing works. Local Diversions will be in place (BBClg)
Lower Kileens Road/Upper Fairhill/Commons Road: Stop/Go in place 0800-1800hrs to facilitate bridge repair and rehabilitation works. Temporary traffic lights will be in place outside of work hours expect delays. (Cumnor)
Sundays Well Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
Shanakiel Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
***N40 Dunkettle Interchange***: Lane Restrictions in place 24hrs until the 7th of May to facilitate interchange upgrade works. (Sisk)
Terence McSwiney Quay/Anglesea Street: A 24hr Bus Lane closure in place to facilitate the operating of the Vaccination Centre at Cork City Hall. (HSE)
Coburg Street: 24hr Lane restrictions in place until Friday 23rd of April 2021 to facilitate watermain rehab works. Expect delays. (Coffey Northumbrian)
Dublin Hill: Stop/Go in place 0930-1600hrs to facilitate footpath and pedestrian crossing works. (MGOS)
Terence McSwiney Quay/Parnell Bridge: Lane restrictions in place to facilitate cycle lane construction. Rolling footpath closures will also be in place as part of the works. (Cumnor)
Maylor Street: Road Closure in place from 0930-1900hrs from its junction with St Patrick Street to its junction with Parnell Place to facilitate road resurfacing works. Local Diversions will be in place (Lagan)
Paul Street: Road Closure in place from 0930-1900hrs from its junction with Cornmarket Street to its junction with Patricks Street to facilitate road resurfacing works. Pedestrian access will also be limited due to social distancing requirements. Local Diversions will be in place (Lagan)
Lower Kileens Road/Upper Fairhill/Commons Road: Stop/Go in place 0800-1800hrs to facilitate bridge repair and rehabilitation works. Temporary traffic lights will be in place outside of work hours expect delays. (Cumnor)
Sundays Well Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
Shanakiel Road: Stop/Go in place 1900-0600hrs to facilitate site investigation works. (Farrans)
************************************************************************************************
Cork City Council thanks you for your co-operation and apologises for the disruption that may be caused by these works. Please find all these closures and other information on Cork City Councils Website
************************************************************************************************