Road Closure List - 10th May 2019

Ongoing Road Closures and Diversions

MacCurtain Street: Lane restriction in place (bus lane only) to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Sawmill Street: Road Closure in place westbound only, until October 2019, from its junction with Rutland Street and Junction with White Street, to facilitate Rutland Square Social Housing Development ( O`Shea Builders)

Sunday’s Well / Wellington Bridge Junction: Localised Stop/Go in operation to facilitate junction upgrade works (Sorensen Civil Eng.)

Carbery Grove, Knocknaheeny: Road closure in place form 0930hrs on Monday the 2nd of July until Friday 17th of May 2019 on Carbery Grove (Between its Junction with Harbour View Road and Junction with Ardmore Avenue at the rear of Bernardos Brighter Future Centre) as part of the City Northwest Quarter Regeneration Scheme Phase 2A. (Murnane & O`Shea)

  • Access for residents on Carbery Grove will be via a new temporary road entering/existing on Ardmore Avenue for this period.
  • A new temporary entrance/exist will be provided from Dunmanus Park for residents of 98-110A Harbour View Road.

Merchants Quay: Lane restriction in place to facilitate preparatory works for Harley Street Bridge Installation (L&M Keating)

St. Patrick’s Quay: Lane restriction in place to facilitate preparatory works for Harley Street Bridge Installation, expect delays (L&M Keating)

Centre Park Road: Localised Give/Take and localised Stop/Go in operation 0800-1800hrs to facilitate footpath renewal works (MGOS)

Millerd Street: Road Closure in place from Friday 22nd of March 2019 until March 2020 from its junction with Francis Street to its junction with Henry Street to facilitate apartment block redevelopment (Vision Contracting)

Coleman’s Lane: Road Closure in place from Monday 15th of April 2019 until 31st of July 2020 from its junction with Grattan Street to its junction with North Main Street to facilitate apartment block redevelopment (MMD Construction)

Daily Road Closures and Diversions

Saturday 11th of May 2019

Darkness to Light 5K Walk in aid of Pieta House – Event commences at 0415hrs

Route 1: City Centre - Student Centre UCC, Gaol Cross, Mardyke Walk, Wellington Bridge, Shanakiel Road, Sunday’s Well Road, North Mall, Sli Cumann na mBan Walk, Bandfield.

Please note there will be road closures in place on North Mall, Sundays Well Avenue, Sundays Well Road to facilitate the event.

See https://www.darknessintolight.ie/event/ucc-cork for more details on this route

Route 2: Ballyvolane - Dunnes Stores Carpark, Ballyhooly Road, Mervue Lawn, Kinvara estate, Dublin Hill Upper, Hawthorn Estate, Ballincollie Road, North Ring Road.

Please note there will be no road closures in place for this event.

See https://www.darknessintolight.ie/event/ballyvolane for more details on this route

Liberty Street: Lane Restriction (Westbound Only) in place from 0930hrs Tuesday 07th of May 2019 until 1800hrs Wednesday 15th of May 2019 South Main Street to Cross Street to facilitate drainage repairs (CCC Drainage)

Sunday 12th of May 2019

Blarney Street: Road closure in place 1400-2000hrs from its junctions with Old Market Place and Upper Cattle Market Street to facilitate water connection repair works (CCC Water)

Liberty Street: Lane Restriction (Westbound Only) in place from 0930hrs Tuesday 07th of May 2019 until 1800hrs Wednesday 15th of May 2019 South Main Street to Cross Street to facilitate drainage repairs (CCC Drainage)

Monday 13th of May 2019

Lee Road/ Sunday’s Well/ Tomas Davis Bridge Junction: Stop/Go in operation from 1930-0600hrs daily from Monday 13th of May until Friday 17th of May to facilitate new junction layout works (Sorenson Civil Engineering Limited)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out (DFL):

  • Mon-Wed: 0930-1430hrs & 1930-0600hrs
  • Thur-Friday: 2100-0600hrs

St. Patrick’s Quay: Lane restriction in place 1930-0600hr from Brian Boru Street to Harley Street to facilitate water main works. (Ward and Burke Construction)

MacCurtain Street: Lane restriction in place 0930-1530hr to facilitate water main connection on the Southside of MacCurtain Street. The MacCurtain Street Bus lane will be used to facilitate a second live lane of traffic. (Coffey Northumbrian)

MacCurtain Street: Lane restriction in place in the bus lane from 1600hrs Monday 13th of May until 1800hrs Friday 31st of May from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Devonshire Street: Road Closure in place from 1930hrs on Monday 13th of May until 1700hrs on Friday 17th of May 2019 from its junction with Pine Street and Coburg Street to facilitate water main connection works. (Coffey Northumbrian)

Skehard Road: Stop/Go in operation from 0930-1800hrs daily from Monday 13th of May until Friday 17th of May at the junction with Oakdene to facilitate water main installation (Coffey Northumbrian)

Infirmary Road: Lane restriction 0930-1600hrs to facilitate footpath repairs. The cycle lane will be affected for the duration of the works and until 1000hrs on Tuesday 14th of May. (CCC Roads South)

Pic du Jer Park: Stop/Go in operation from 0930-1800hr daily from Tuesday 07th of May until Friday 10th of May 2019 to facilitate water main works. Douglas Drive will also be affected at this time.  (Coffey Northumbrian)

Upper Derrynane Road: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday17th of May 2019 from its junctions with Mount Pleasant Road and Friar’s Walk to facilitate water main works. (Coffey Northumbrian)

Beaufort Park/ St. Anne’s Park: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday 17th of May 2019 from its junctions with Curagh Road and Derrynane Road to facilitate water main works. (Coffey Northumbrian)

Liberty Street: Lane Closure (Westbound Only) in place from 0930hrs Tuesday 07th of May 2019 until 1800hrs Wednesday 15th of May 2019 South Main Street to Cross Street to facilitate drainage repairs (CCC Drainage)

Somerton Park: Stop/Go in operation 0930-1600hrs daily from Monday 13th of May until Friday 24th of May to facilitate drainage repairs. (CCC Drainage)

Pope’s Hill: Stop/Go in operation 0800-1800hrs to facilitate overhead cable works. Rathmore Park, Sutton’s Buildings and Roche’s Buildings will also be affected by these works. (Siro)

Orchard Court: Stop/Go in operation 0800-1800hrs to facilitate underground cable works. (Siro)

Fairfield Meadows: Stop/Go in operation 0800-1800hrs from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Willow Bank: Stop/Go in operation 0800- from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

McSwiney’s Villas: Stop/Go in operation 0930-1600hrs between St. Theresea’s Road and McSwiney’s Villas on to facilitate overhead cable works. (TLI Group)

Ballyvolane Road: Stop/Go in operation 0930-1600hrs to facilitate pole replacement works. Ballincollie Road will also be affected by these works. (TLI Group)

Blarney Street: Lane restriction in place 0930-1600hr daily from Tuesday 07th of May until Friday 17th of May to facilitate gas connection works (BBCLG)

Albert Quay: Lane restriction in place from 1930-0600hrs to facilitate ducting installation (BAM Construction)

Crane Lane: Road Closure in place from 1930-2330hrs to facilitate construction works (O’ Shea Builders)

Lough Road: Stop/ Go in operation from 0930-1600hrs between its junctions with Gould Street and Greenmount Avenue to facilitate construction works (Barry Ryan Civil Engineering)

Victoria Cross: Lane restriction inbound from 1000-1500hrs to facilitate construction works (MGOS)

Tuesday 14th of May 2019

Lee Road/ Sunday’s Well/ Tomas Davis Bridge Junction: Stop/Go in operation from 1930-0600hrs daily from Monday 13th of May until Friday 17th of May to facilitate new junction layout works (Sorenson Civil Engineering Limited)

South Mall: A lane restriction will be in place for the following hours to facilitate material removal from No.1 South Mall internal fit out (DFL):

  • Mon-Wed: 0930-1430hrs & 1930-0600hrs
  • Thur-Friday: 2100-0600hrs

St. Patrick’s Quay: Lane restriction in place 1930-0600hr from Brian Boru Street to Harley Street to facilitate water main works. (Ward and Burke Construction)

Lower Glanmire Road: Lane restriction in place 1930-0600 at its junction with Ship Street to facilitate watermain connection.

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 31st of May from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Devonshire Street: Road Closure in place from 1930hrs on Monday 13th of May until 1700hrs on Friday 17th of May 2019 from its junction with Pine Street and Coburg Street to facilitate water main connection works. (Coffey Northumbrian)

Skehard Road: Stop/Go in operation from 0930-1800hrs daily from Monday 13th of May until Friday 17th of May at the junction with Oakdene to facilitate water main installation (Coffey Northumbrian) Upper Derrynane Road: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday17th of May 2019 from its junctions with Mount Pleasant Road and Friar’s Walk to facilitate water main works. (Coffey Northumbrian)

Beaufort Park/ St. Anne’s Park: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday 17th of May 2019 from its junctions with Curagh Road and Derrynane Road to facilitate water main works. (Coffey Northumbrian)

O’ Connell Crescent: Stop/Go in operation from 0930-1800hrs at the junction with O’ Connell Avenue to facilitate water main installation (Coffey Northumbrian)

Pic du Jer Park: Stop/Go in operation from 0930-1800hr daily from Tuesday 07th of May until Friday 10th of May 2019 to facilitate water main works. Douglas Drive will also be affected at this time.  (Coffey Northumbrian)

Liberty Street: Lane Closure (Westbound Only) in place from 0930hrs Tuesday 07th of May 2019 until 1800hrs Wednesday 15th of May 2019 South Main Street to Cross Street to facilitate drainage repairs (CCC Drainage)

Somerton Park: Stop/Go in operation 0930-1600hrs daily from Monday 13th of May until Friday 24th of May to facilitate drainage repairs. (CCC Drainage)

Goldsmith’s Avenue/ Richmond Hill (upper)/ Old Youghal Road: Stop/Go in operation 0930-1600hrs to facilitate overhead cable works. Shandon Court, Rathmore Terrace and Sarsfield’s Terrace will also be affected by these works. (Siro)

Orchard Court: Stop/Go in operation 0800-1800hrs to facilitate underground cable works. (Siro)

Fairfield Meadows: Stop/Go in operation 0800-1800hrs from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Ballyhooly Road: Stop/Go in operation 0930-1600hrs between St. Luke’s Cross and Windsor Cottages to facilitate overhead cable works. (TLI Group)

Cahergal Avenue: Stop/Go in operation 0800-1800 to facilitate pole replacement works. (TLI Group)

Cahergal Lawn: Lane restriction in place 0800-1800 to facilitate pole replacement works. (TLI Group)

Blarney Street: Lane restriction in place 0930-1600hr daily from Tuesday 07th of May until Friday 17th of May to facilitate gas connection works (BBCLG)

Albert Quay: Lane restriction in place from 1930-0600hrs to facilitate ducting installation (BAM Construction)

Victoria Cross: Lane restriction inbound from 1000-1500hrs to facilitate construction works (MGOS)

Wednesday 15th of May 2019

Lee Road/ Sunday’s Well/ Tomas Davis Bridge Junction: Stop/Go in operation from 1930-0600hrs daily from Monday 13th of May until Friday 17th of May to facilitate new junction layout works (Sorenson Civil Engineering Limited)

St. Patrick’s Quay: Lane restriction in place 1930-0600hr from Harley Street to St. Patrick’s Bridge to facilitate water main works. (Ward and Burke Construction)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 31st of May from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Devonshire Street: Road Closure in place from 1930hrs on Monday 13th of May until 1700hrs on Friday 17th of May 2019 from its junction with Pine Street and Coburg Street to facilitate water main connection works. (Coffey Northumbrian)

Skehard Road: Stop/Go in operation from 0930-1800hrs daily from Monday 13th of May until Friday 17th of May at the junction with Oakdene to facilitate water main installation (Coffey Northumbrian) Willow Lawn: Road Closure in place from 0930-1600hr daily on Wednesday 15th of May until Friday 17th of May 2019 to facilitate water main works. (Coffey Northumbrian)

Upper Derrynane Road: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday17th of May 2019 from its junctions with Mount Pleasant Road and Friar’s Walk to facilitate water main works. (Coffey Northumbrian)

Beaufort Park/ St. Anne’s Park: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday 17th of May 2019 from its junctions with Curagh Road and Derrynane Road to facilitate water main works. (Coffey Northumbrian)

O’ Connell Crescent: Stop/Go in operation from 0930-1800hrs at the junction with O’ Connell Avenue to facilitate water main installation (Coffey Northumbrian)

Liberty Street: Lane Closure (Westbound Only) in place from 0930hrs Tuesday 07th of May 2019 until 1800hrs Wednesday 15th of May 2019 South Main Street to Cross Street to facilitate drainage repairs (CCC Drainage)

Somerton Park: Stop/Go in operation 0930-1600hrs daily from Monday 13th of May until Friday 24th of May to facilitate drainage repairs. (CCC Drainage)

South Lodge: Stop/Go in operation 0930-1700hrs to facilitate drainage repairs. (CCC Water)

St. Patrick’s Hill/ Audley Place/ Old Youghal Road: Stop/Go in operation 0930-1600hrs to facilitate overhead cable works. (Siro)

Upper Cattle Market Street: Stop/Go in operation 0930-1600hrs on to facilitate underground cable works. (Siro)

Hattons Alley Lane/ Broad Lane/ Seminary Court: Stop/Go in operation 0800-1800hrs to facilitate underground cable works. (Siro)

Fairfield Meadows: Stop/Go in operation 0800-1800hrs from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Willow Bank: Stop/Go in operation 0800- from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Cahergal Avenue: Stop/Go in operation 0800-1800 to facilitate pole replacement works. (TLI Group)

Cahergal Lawn: Lane restriction in place 0800-1800 to facilitate pole replacement works. (TLI Group)

Blarney Street: Lane restriction in place 0930-1600hr daily from Tuesday 07th of May until Friday 17th of May to facilitate gas connection works (BBCLG)

Albert Quay: Lane restriction in place from 1930-0600hrs to facilitate ducting installation (BAM Construction)

South Mall: Lane restriction in place from 0430-0630hrs at No. 26/27 South Mall to facilitate construction works (O’ Shea Builders)

Victoria Cross: Lane restriction inbound from 1000-1500hrs to facilitate construction works (MGOS)

Kilmore Road Lower: Stop/Go in operation 0930-1600hrs to facilitate ESB Ducting Works (MGOS)

Thursday 16th of May 2019

Lee Road/ Sunday’s Well/ Tomas Davis Bridge Junction: Stop/Go in operation from 1930-0600hrs daily from Monday 13th of May until Friday 17th of May to facilitate new junction layout works (Sorenson Civil Engineering Limited)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 31st of May from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Devonshire Street: Road Closure in place from 1930hrs on Monday 13th of May until 1700hrs on Friday 17th of May 2019 from its junction with Pine Street and Coburg Street to facilitate water main connection works. (Coffey Northumbrian)

Skehard Road: Stop/Go in operation from 0930-1800hrs daily from Monday 13th of May until Friday 17th of May at the junction with Oakdene to facilitate water main installation (Coffey Northumbrian) Willow Lawn: Road Closure in place from 0930-1600hr daily on Wednesday 15th of May until Friday 17th of May 2019 to facilitate water main works. (Coffey Northumbrian)

Upper Derrynane Road: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday17th of May 2019 from its junctions with Mount Pleasant Road and Friar’s Walk to facilitate water main works. (Coffey Northumbrian)

Beaufort Park/ St. Anne’s Park: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday 17th of May 2019 from its junctions with Curagh Road and Derrynane Road to facilitate water main works. (Coffey Northumbrian)

Richmond Hill: Stop/Go in operation 0930-1600hrs to facilitate overhead cable works. (Siro)

Upper Cattle Market Street: Stop/Go in operation 0930-1600hrs on to facilitate underground cable works. (Siro)

Hattons Alley Lane/ Broad Lane/ Seminary Court: Stop/Go in operation 0800-1800hrs to facilitate underground cable works. (Siro)

Fairfield Meadows: Stop/Go in operation 0800-1800hrs from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Willow Bank: Stop/Go in operation 0800- from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Shrewsbury Villas: Stop/Go in operation 0930-1800hrs on to facilitate overhead cable works. (TLI Group)

Cahergal Park: Stop/Go in operation 0930-1600hrs to facilitate pole replacement works. (TLI Group)

Blarney Street: Lane restriction in place 0930-1600hrs daily from Tuesday 07th of May until Friday 17th of May to facilitate gas connection works (BBCLG)

Albert Quay: Lane restriction in place from 1930-0600hrs to facilitate ducting installation (BAM Construction)

Somerton Park: Stop/Go in operation 0930-1600hrs daily from Monday 13th of May until Friday 24th of May to facilitate drainage repairs. (CCC Drainage)

Ballinlough Road: Stop/Go in operation 0930-1600hrs to facilitate drainage repairs. (CCC Water)

Kilmore Road Lower: Stop/Go in operation 0930-1600hrs to facilitate ESB Ducting Works (MGOS)

Friday 17th of May 2019

***Merchants Quay and Patricks Quay Closure*** Closure from 2200hrs on Friday 17th of May until 0600hrs on Monday 20th of May to facilitate Harley Street Bridge Lift. (L&M Keating)

  • Merchant’s Quay closed from St. Patrick’s Street to Parnell Place
  • St. Patrick’s Quay closed from Brian Boru Street to Bridge Street
  • Local divesions will be in place.

Lee Road/ Sunday’s Well/ Tomas Davis Bridge Junction: Stop/Go in operation from 1930-0600hrs daily from Monday 13th of May until Friday 17th of May to facilitate new junction layout works (Sorenson Civil Engineering Limited)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 31st of May from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Devonshire Street: Road Closure in place from 1930hrs on Monday 13th of May until 1700hrs on Friday 17th of May 2019 from its junction with Pine Street and Coburg Street to facilitate water main connection works. (Coffey Northumbrian)

Skehard Road: Stop/Go in operation from 0930-1800hrs daily from Monday 13th of May until Friday 17th of May at the junction with Oakdene to facilitate water main installation (Coffey Northumbrian) Willow Lawn: Road Closure in place from 0930-1600hr daily on Wednesday 15th of May until Friday 17th of May 2019 to facilitate water main works. (Coffey Northumbrian)

Upper Derrynane Road: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday17th of May 2019 from its junctions with Mount Pleasant Road and Friar’s Walk to facilitate water main works. (Coffey Northumbrian)

Beaufort Park/ St. Anne’s Park: Road Closure in place from 0930hr on Monday 13th of May until 1800hr Friday 17th of May 2019 from its junctions with Curagh Road and Derrynane Road to facilitate water main works. (Coffey Northumbrian)

Fairfield Meadows: Stop/Go in operation 0800-1800hrs from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Willow Bank: Stop/Go in operation 0800- from Monday 13th of May until Friday 17th of May to facilitate underground cable works (Siro)

Dillon’s Cross: Stop/Go in operation 0930-1600hrs on to facilitate ESB pole replacement works. (TLI Group)

Sawmill Street: Road Closure in place 0930-1930hrs from its junction with Rutland Street and junction with White Street, to facilitate Rutland Square Social Housing Development (O’Shea Builders)

Ballyhooly Road: Stop/Go in operation 0930-1600hrs at its junction with Gordon’s Hill to facilitate pole replacement works. (TLI Group)

Blarney Street: Lane restriction in place 0930-1600hr daily from Tuesday 07th of May until Friday 17th of May to facilitate gas connection works (BBCLG)

Somerton Park: Stop/Go in operation 0930-1600hrs daily from Monday 13th of May until Friday 24th of May to facilitate drainage repairs. (CCC Drainage)

Kilmore Road Lower: Stop/Go in operation 0930-1600hrs to facilitate ESB Ducting Works (MGOS)

Road Closures due to Events

************************************************************************************************

Cork City Council thanks you for your co-operation and apologises for the disruption that may be caused by these works. 

************************************************************************************************