Daly’s (Shakey) Bridge: Bridge Closure in place to pedestrians from Monday 12th of August until approx April 2020. The closure is necessary to facilitate the carrying out of repair and restoration works to Daly (Shakey) Bridge. Cork City Council regrets any inconvenience that may occur.

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 30th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Sawmill Street: Road Closure in place westbound only, until October 2019, from its junction with Rutland Street and Junction with White Street, to facilitate Rutland Square Social Housing Development (O’Shea Builders)

Carbery Grove, Knocknaheeny: Road closure in place form 0930hrs on Monday the 2nd of July 2018 until Friday 23rd of August 2019 on Carbery Grove (Between its Junction with Harbour View Road and Junction with Ardmore Avenue at the rear of Bernardos Brighter Future Centre) as part of the City Northwest Quarter Regeneration Scheme Phase 2A. (Murnane & O’Shea)

  • Access for residents on Carbery Grove will be via a new temporary road entering/existing on Ardmore Avenue for this period.
  • A new temporary entrance/exist will be provided from Dunmanus Park for residents of 98-110A Harbour View Road.

Millerd Street: Road Closure in place from Friday 22nd of March 2019 until March 2020 from its junction with Francis Street to its junction with Henry Street to facilitate apartment block redevelopment (Vision Contracting)

Coleman’s Lane: Road Closure in place from Monday 15th of April 2019 until 31st of July 2020 from its junction with Grattan Street to its junction with North Main Street to facilitate apartment block redevelopment (MMD Construction)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Daily Road Closures and Diversions

Saturday 17th of August 2019

N40 South Ring Road: Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

Anglesea Street / South Terrace/ Langford Row: Lane restriction in operation 0600-1400hrs to faciliate road relining works (Traffic / CCC)

Mardyke Walk: Road Closure in place from 0900hrs to 1500hrs from its junction with Dyke Parade to facilitate tree trimming works (Parks / CCC)

Cornmarket Street: Road Closure in place 1100-1800hrs from its junction with  Castle Street to its junction with Kyrls Quay to facilitate the coal quay festival

Sunday 18th of August 2019

***Maryborough Hill, Douglas**** Road closure in place from 0800-1800hrs from its junction with the Fingerpost roundabout to its junction with L6477 to facilitate a crane lift. Local diversion will be in place and local access will be maintained from sides of the works (K&N Group)

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Monday 19th of August 2019

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 16th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the northside of MacCurtain Street. (Coffey Northumbrian)

Bridge Street: Lane restriction in operation 2000-0600hrs to facilitate watermain installation (Coffey Northumbrian)

Skehard Road / Church Road Junction: Three-way stop/go in operation 1930-0600hrs to facilitate watermain installation (Coffey Northumbrian)

Camden Quay Bus Lane: Bus Lane closure in place from 0930hrs on Monday 19th of August until 1800hrs on Friday 23rd of August to facilitate water main installation works (Ward and Burke)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Victoria cross: Lane restriction in operation 2000-0600hrs to faciliate chamber works (K&N Group)

Magazine Road: Stop/Go in operatuion 0930-1600hrs to faciliate overhead broadband works (Siro)

Doyle Road: Road Closure in place from 0830hrs to 1800hrs  from its junction with Firars Walk to its junction with O Connell Avenue to faciliate road resurfacing works (Lagan Asphalt)

Derrynane Road: Road Closure in place from 0830hrs to 1800hrs  from its junction with Firars Walk to its junction with O Connell Avenue to faciliate road resurfacing works (Lagan Asphalt)

Cross Douglas Road: Road closure in place from 0930-1700hrs from its junction with the South Douglas Road to its junction with the Douglas Road to faciliate chamber installation (Lagan Asphalt)

Tuesday 20th of August 2019

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 16th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Bridge Street: Lane restriction in operation 2000-0600hrs to facilitate watermain installation (Coffey Northumbrian)

Camden Quay Bus Lane: Bus Lane closure in place from 0930hrs on Monday 19th of August until 1800hrs on Friday 23rd of August to facilitate water main installation works (Ward and Burke)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Victoria cross: Lane restriction in operation 2000-0600hrs to faciliate chamber works (K&N Group)

Rochestown Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

The Link Road, Ballincollig: Stop/Go in operation 0930-1800hrs to facilitate gas connection works (BBCLG/GNI)

Rochestown Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

Alfred Street: Stop/Go in operation 0000-0600hrs to faciliate drainage connection repair (PJ Hegarty & Son)

Pophams Road: Stop/Go in operatuion 0930-1600hrs to faciliate overhead broadband works (Siro)

Derrynane Road: Road Closure in place from 0830hrs to 1800hrs  from its junction with Firars Walk to its junction with O Connell Avenue to faciliate road resurfacing works (Lagan Asphalt)

Father Matthew Road: Road Cloaure in place from 0830hrs until 1800hrs from its junction with Mount Pleasant Avenue to its junction with O Connell Avenue (Lagan Asphalt)

Wednesday 21st of August 2019

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 16th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Bridge Street: Lane restriction in operation 1930-0600hrs to facilitate water main installation works (Coffey Northumbrian)

Camden Quay Bus Lane: Bus Lane closure in place from 0930hrs on Monday 19th of August until 1800hrs on Friday 23rd of August to facilitate water main installation works (Ward and Burke)

Pine Street: Road closure in place 2000-0600hrs from its junction with Camden Quay to its junction Devonshire Street to facilitate watermain installation (Ward & Burke)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Blackrock Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

Rochestown Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

The Link Road, Ballincollig: Stop/Go in operation 0930-1800hrs to facilitate gas connection works (BBCLG/GNI)

Alfred Street: Stop/Go in operation 0000-0600hrs to faciliate drainage connection repair (PJ Hegarty & Son)

Farranferris Avenue / Semianry Walk: Stop/Go in operatuion 0930-1600hrs to faciliate overhead broadband works (Siro)

Father Matthew Road: Road Cloaure in place from 0830hrs until 1800hrs from its junction with Mount Pleasant Avenue to its junction with O Connell Avenue (Lagan Asphalt)

Friars Road: Road Closure in place from 0830hrs to 1800hrs from its junction with Congress Road to its junction with O Connell Avenue (Lagan Asphalt)

Thursday 22nd of August 2019

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 16th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Camden Quay Bus Lane: Bus Lane closure in place from 0930hrs on Monday 19th of August until 1800hrs on Friday 23rd of August to facilitate water main installation works (Ward and Burke)

Pine Street: Road closure in place 2000-0600hrs from its junction with Camden Quay to its junction Devonshire Street to facilitate watermain installation (Ward & Burke)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Blackrock Road: Stop/Go in operation 0930-1600hrs to facilitate gas connection works (BBCLG/GNI)

The Link Road, Ballincollig: Stop/Go in operation 0930-1800hrs to facilitate gas connection works (BBCLG/GNI)

Redemption Road: Stop/Go in operatuion 0930-1600hrs to faciliate overhead broadband works (Siro)

Friars Road: Road Closure in place from 0830hrs to 1800hrs from its junction with Congress Road to its junction with O Connell Avenue (Lagan Asphalt)

Beaufort Park: Road Closure in place from 0830-1800hrs from ist junction with the Curragh Road, to its junction with Derrynane Road. St Annes Park will also be affected as part of the works, local access is to be miantained (Lagan Asphalt)

Friday 23rd of August 2019

N40 South Ring Road (Eastbound): Lane restriction in operation on the Sarsfield Flyover to facilitate ITS board installation (JONS Civil Engineering)

N40 South Ring Road (Westbound): Lane restriction in operation on the Kinsale Flyover / Togher Merge Lane to facilitate ITS board installation (JONS Civil Engineering)

Lower Glanmire Road: Lane restriction in operation daily 0800-1600hrs to facilitate footpath renewal works (Lagan Asphalt)

Lower Glanmire Road: Lane restriction in operation 24hr from its junction with Water Street to approx the Ferry Boat Pub to facilitate footpath renewal works. A Stop/Go will be in operation 1000-1530hrs at the same location o facilitate concrete pouring, expect delays (Lagan Asphalt)

MacCurtain Street: Lane restriction in place in the bus lane from 0930hrs Monday 13th of May until 1800hrs Friday 16th of August from its junction with St. Patricks Hill to York Street  to facilitate water main installation on the Northside of MacCurtain Street. (Coffey Northumbrian)

Camden Quay Bus Lane: Bus Lane closure in place from 0930hrs on Monday 19th of August until 1800hrs on Friday 23rd of August to facilitate water main installation works (Ward and Burke)

Churchyard Lane / Ballinlough Road Junction: Three Way Stop/Go in operation 0930-1600  and 1930-2330hr to faciliate site service works. (Centurion Homes)

Ballinlough Road: Stop/Go in operation 0930-1800hrs to faciliate site services works (Centurion Homes)

Beaufort Park: Road Closure in place from 0830-1800hrs from ist junction with the Curragh Road, to its junction with Derrynane Road. St Annes Park will also be affected as part of the works, local access is to be miantained (Lagan Asphalt)

St. Finbarr’s Park: Road closure in place from 0830-1800hrs from its junction  with Hartelands Avenue to its junction with Glasheen Road to facilitate road  resurfacing works (Lagan Asphalt)

N40 Special Speed Limit Reductions:

A 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N40 South Ring Road Westbound from the top of the Kinsale Flyover to a point 300m west of where the Togher merge lane meets the N40 and including merge ramps from the Kinsale Road Roundabout taking vehicles westbound on the N40.

The proposed Westbound special speed limit order will apply temporary speed limits at the above location from Site 6: 24th June 2019 to the 30th August 2019

A proposed 60 kph special works speed limit to apply (in place of the current speed limit of 100KPH) on the N40 South Ring Road Eastbound from where the merge lane from the Bandon Road Roundabout  meets the N40, to a point 150m east of where the Sarsfield Road Roundabout merge lane meets the N40. Eastbound Merge and Diverge lanes at the Sarsfield road roundabout are to be included

The proposed Eastbound special speed limit order will apply temporary speed limits at the above location from Site 5: 2nd July 2019 to the 20th September 2019

Road Closures due to Events

************************************************************************************************